DOSH Inspection Preparation: The Employer's Checklist
Published 23 September 2026 · Regulatory Hub
A DOSH inspector can arrive unannounced. Under section 15(1), every employer must ensure, so far as is practicable, the safety, health and welfare at work of all employees — and the inspector has the authority to issue immediate stop-work orders, compound offences, or recommend prosecution.
This checklist covers the 10 most common inspection failure points we see during pre-audit gap assessments.
Naja Safety runs pre-audit gap checks so you know what DOSH will ask before they arrive.
1. HIRARC Register
What inspectors look for: A current Hazard Identification, Risk Assessment, and Risk Control (HIRARC) register that covers all work activities, not just the obvious ones.
Common failure: Outdated HIRARC that does not reflect current processes, or generic templates copied from the internet.
Fix: Update your HIRARC annually or whenever processes change. Include control measures with responsible persons and deadlines.
Book a pre-audit gap check
We run pre-audit gap checks so you know what DOSH will ask before they arrive.
2. Safety and Health Committee
Mandatory for: 40 or more persons employed, or where the Director General directs.
What inspectors check:
- Committee formation letter (signed by employer)
- Meeting minutes (quarterly minimum)
- Training certificates for committee members
- Inspection reports and action tracking
Common failure: Committee exists on paper but never meets, or members lack certified training. We deliver Safety Committee Training on-site.
3. First-Aiders and Emergency Response
Requirement: Low-risk sites: 1 first-aider for under 20 workers, 2 for 21–150, then 2 for every 150. High-risk sites (e.g. construction, chemical plants): 1 per shift for under 20, then 1 for every 20 workers. Over 400 workers: 2 per 150 plus a registered nurse or medical assistant. Retraining every 3 years. First-aid boxes must be stocked and accessible.
Common failure: First-aider certificates expired. No emergency response drill records. No written emergency procedure posted.
4. Machinery and Equipment Registers
Certain equipment — such as boilers, unfired pressure vessels, passenger lifts and cranes — requires a certificate of fitness. The Factories and Machinery Act 1967, which previously governed this, was repealed on 1 June 2024.
Common failure: Equipment operated without valid certificate of fitness, or annual inspection overdue.
5. Chemical Management (USECHH 2000)
If you handle scheduled chemicals:
- CHRA must be current and site-specific
- Safety Data Sheets (SDS) must be accessible to workers
- Chemical labels must be legible and in Malay/English
- LEV systems must have inspection records
Common failure: SDS stored in an office, not on the shop floor where workers can access them during a spill.
6. Noise Exposure (2019 Regulations)
The excessive noise threshold is 82 dB(A) under the OSH (Noise Exposure) Regulations 2019 [P.U.(A) 60/2019]. If your workplace exceeds this, you need:
- Noise risk assessment by a DOSH-registered assessor, reviewed at least every five years; annual audiometric testing where exposure exceeds the limit
- Hearing conservation programme
- Audiometric testing records
- PPE provision and training records
7. Training Records
Inspectors will ask for evidence that workers have been trained on:
- Safe work procedures for their specific tasks
- Emergency response (fire, chemical spill, evacuation)
- PPE selection, use, and maintenance
Common failure: Generic safety briefing with no attendance signatures or competency verification.
What Happens If You Fail?
- Immediate: Stop-work order, prohibition notice, or improvement notice
- Short-term: Compound (on-the-spot fine) or prosecution
- Corporate: For general duty breaches under ss.15–18A of the amended Act, fines can reach up to RM500,000
Pre-Audit Gap Assessment
We can help you prepare. Our pre-DOSH gap assessments identify compliance gaps before the inspector arrives. We provide a prioritised action plan with timelines, responsibilities, and documentation templates.
← All articles · Regulatory Hub · Services
Book a pre-audit gap check
We run pre-audit gap checks so you know what DOSH will ask before they arrive.
Sources
- Occupational Safety and Health Act 1994 [Act 514]. www.dosh.gov.my
- OSH (Amendment) Act 2022 [Act A1648]. www.dosh.gov.my
- OSH (Safety and Health Committee) Regulations 1996 [P.U.(A) 183/1996]. www.dosh.gov.my
- OSH (Safety and Health Officer) Regulations 1997 [P.U.(A) 105/1997]. www.dosh.gov.my
- OSH (Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease) Regulations 2004 [P.U.(A) 149/2004]. www.dosh.gov.my
- DOSH. Guidelines on Occupational Safety and Health Inspection. www.dosh.gov.my
